- Development of specification and design basis
- Preparation of Electrical Single line diagram
- Selection of HV/LV Switchgear, Motor Control Centers
- Substation Component sizing, design and drawing development
- Layout for Switchyard / Transformer layouts, Switchgear / MCC Room layout, Battery room layouts
- Cable tray / Trench layouts, Cable routing layouts
- Power, Earthing & Lightening layout development
- System studies including Load flow, short circuit analysis starting methods reacceleration analysis
- Tender development for site subcontracting work, bids review & recommendation. Requisition preparation, technical evaluation with final recommendation for electrical systems & components
- Cable schedules
Total Strength: 5 Nos (3 Staffs, 2 Contract)
1
Lead Engineer (13 Yrs)
2
Engineers (5-10 Yrs)
2
Designers (4-8 Yrs)